BUILD THE WAY

view portfolio

01 — Manifesto

WE BUILD WITH CLARITY

Clean drawings, clean sites, clean handoffs. We price honestly, plan early, and deliver work that holds up to weather, wear, and warranty.

01

Early Clarity

Scope, alternates, and logistics mapped up front so cost and schedule don’t wander.

02

Safety First

Training, signage, and daily checks. Everyone goes home; the work keeps moving.

03

Drawings Win

Constructible sets with real details—no guesswork for subs, no rework for owners.

04

Schedules That Hold

Long‑lead tracking, phased releases, and recovery plans that are actually credible.

05

Clean Runs

Organized laydown, tidy penetrations, and documented QC so fit‑out flies.

06

Accountable

One point of contact. Issues logged, decisions documented, fixes closed.

25+ years building
1.2k projects delivered
98% on‑time rate
0.68 EMR safety

02 — Projects

Selected Work

Representative builds across industrial, commercial, civic, and residential — with quick facts for context.

  1. Riverside Logistics Hub exterior with cross‑dock bays
    Commercial

    Riverside Logistics Hub

    1.2M‑sq‑ft cross‑dock facility with 72 loading bays, 36‑ft clear heights, and slab tolerances built for high‑throughput workflows.

    • RoleGC
    • DeliveryDesign‑Build
    • Size1.2M SF
    • Year2024
    • 72 loading bays with cross‑dock logistics
    • 36‑ft clear heights & heavy slab tolerances
    • High‑throughput yard circulation & staging
    • Precon
    • Design‑Build
    • Schedule Control
    • QA/QC
    View case study
  2. Quarry Operations HQ office and plant interface
    Industrial

    Quarry Operations HQ

    Heavy‑duty core with dust‑control vestibules, equipment mezzanines, and maintainable runs for 24/7 production.

    • RoleGC
    • DeliveryGeneral Contracting
    • Size
    • Year
    • Dust‑control vestibules & negative‑pressure zones
    • Equipment mezzanines for safe service access
    • Maintainability for continuous operations
    • General Contracting
    • Safety
    • Maintenance
    View case study
  3. Harbourview Residences waterfront elevation at dusk
    Residential

    Harbourview Residences

    Reinforced podium with post‑tensioned decks, energy‑efficient envelope, and acoustic detailing between stacks.

    • RoleGC
    • DeliveryCM‑at‑Risk
    • Size
    • Year
    • Reinforced podium with PT decks
    • High‑performance envelope
    • Acoustic separation between stacks
    • Residential
    • Envelope
    • Acoustics
    View case study
  4. Civic Performance Hall interior seating and stage
    Civic

    Civic Performance Hall

    A 1,200‑seat venue with tuned wall assemblies, floating slabs for stage areas, and precise sight‑line coordination.

    • RoleGC
    • DeliveryCM‑at‑Risk
    • Size1,200 seats
    • Year
    • Tuned wall assemblies for balanced acoustics
    • Floating slabs at stage & orchestra areas
    • Sight‑line and seating bowl coordination
    • Civic
    • Acoustics
    • Concrete
    • Coordination
    View case study
  5. Northline Tech Campus courtyard and glass façade
    Office

    Northline Tech Campus

    Multi‑building core & shell with chilled‑beam readiness, raised access floors, and modular infill for fast tenanting.

    • RoleGC
    • DeliveryCore & Shell
    • Size
    • Year
    • Chilled‑beam readiness & MEP coordination
    • Raised access floors for flexible layouts
    • Modular infill for rapid tenanting
    • Office
    • Core & Shell
    • MEP Ready
    • Fast Tenanting
    View case study
  6. East Rail Transit Hub concourse with canopies
    Transport

    East Rail Transit Hub

    Long‑span canopies, integrated wayfinding, and durable finish schedules designed for heavy daily foot traffic.

    • RoleGC
    • DeliveryDesign‑Build
    • Size
    • Year
    • Long‑span platform & concourse canopies
    • Integrated wayfinding & signage systems
    • Durable finish schedules for public use
    • Transit
    • Wayfinding
    • Durability
    • Public Realm
    View case study

03 — Services

What We Build & How

From early pricing and logistics to turnover and warranty, we stay accountable at every step.

  • Preconstruction

    Estimate • Plan • De‑risk

    Conceptual + hard bids, VE options, logistics plans, and long‑lead procurement strategy.

    • Conceptual Estimating
    • Scheduling
    • VE/Alt Systems
    • Phasing Plans
  • Design‑Build

    Single‑Team Delivery

    We align design and budget early, with constructability and sub trade input from day one.

    • Target Value
    • Design Assist
    • Early Packages
    • Permitting
  • General Contracting

    Build Clean, Build Tight

    Full site management, quality control, scheduling, and transparent cost controls.

    • Site Management
    • QA/QC
    • Cost Control
    • Turnover
  • Self‑Perform

    Crew Where It Counts

    Concrete, selective demo, blocking, safety details, and closeout punch—done in‑house.

    • Concrete
    • Selective Demo
    • Carpentry
    • Protection
  • Construction Management

    CM / CM‑at‑Risk

    Open‑book delivery with trade coverage, buyout, and schedule recovery plans built in.

    • Procurement
    • Buyout
    • Cost Reporting
    • Recovery Planning
  • Safety & Quality

    Zero Compromise

    Daily audits, toolbox talks, and documented inspections—safety and finish are non‑negotiable.

    • JHAs
    • Toolbox Talks
    • Inspections
    • Commissioning
DeliveryDesign‑Build • CM‑at‑Risk • GC
SectorsIndustrial • Commercial • Civic • Residential
CoveragePrecon → Closeout → Warranty

04 — About

WHO WE ARE

We’re a field‑first general contractor focused on predictable delivery: clear pricing up front, tight logistics in the middle, clean handoffs at the end.

We keep drawings constructible, sites tidy, and schedules credible. The point isn’t just finishing — it’s finishing with work that stands up to weather, wear, and warranty.

  • Transparent budgets and alternates from day one
  • Logistics, phasing, and long‑lead tracking built into the plan
  • Daily accountability: issues logged, decisions documented, fixes closed

Leadership

  • Alex Rivera Principal
  • Morgan Chen Operations Director
  • Sam Patel Field Superintendent
See our work

05 — Contact

LET’S BUILD

Tell us about the site, scope, and schedule. We’ll respond with workable next steps.

Prefer email? hello@example.com